Automotive production launch
from 4 to 74+ vehicles a week

Global paint protection film specialist

Throughput, cycle time and quality transformed in a new production operation inside a live car plant in the West Midlands.

18x

Weekly throughput

73%

Cycle time reduction

85%+

Rework reduction

80%+

First time audit pass

The challenge

Low output and heavy rework at launch

A global paint protection film specialist was launching a new production operation inside a car manufacturer’s flagship plant in the West Midlands, working directly within the live flow.

Early output was 4 vehicles a week. Parts often needed repeated attempts to get right and fewer than 1 in 10 vehicles passed the manufacturer’s audit first time.

Output had to grow in two undeveloped 20,000 sq ft warehouse spaces without holding up the line around them. The operation was led on site for 22 months, from launch to stable output.

What made it complex

  • Output of 4 vehicles a week at launch
  • Under 10% passing OEM audit first time
  • A live OEM flow that could not be held up
  • Undeveloped warehouse space to start from

What was delivered

Production line optimisation from launch to stable output

One operations lead across capacity, workflow, quality, people and reporting.

Capacity planning

Capacity planned against production demand, so staffing, training and space could grow in step as weekly output climbed.

Workflow and layout

Undeveloped warehouse space laid out as one flow through wash, preparation, installation, cure and OEM audit stages.

Lean and cycle time

Lean methods including Kanban and Kaizen applied at each stage, cutting cycle time by 73% and improving labour utilisation.

Process control

A full set of SOPs and quality checkpoints written from scratch, cutting rework by over 85% and lifting first time audit passes above 80%.

Workforce planning

Team grown from 6 to 15, with recruitment, onboarding and training frameworks set up to match production demand.

KPI reporting

Custom KPI and operational reporting used to find constraints, improve visibility and support production decisions.

Technician checking electrical controls on a vehicle rig in a production workshop

The result

Output taken from 4 to 74+ vehicles a week on a single shift, while first time audit passes rose from under 10% to over 80%.

40,000 sq ft

Space converted

6 to 15

Team scaled

5

Production stages

Related services

Service used

Constraints in process, throughput and systems found on site, then fixed and stabilised without stopping the line.

Run alongside

New systems, processes and sites introduced with training and adoption planned in, so the change holds.

Where to start

An independent review with a written action plan showing the causes and what to fix, for a fixed £2,450.

Output falling short or rework too high?

Describe the operation and get a clear view of how it could be improved, from layout and process to the team running it.

Or reach out directly

Discuss your project

Send a few details and we will be in touch to discuss.

    Details are used to reply to this enquiry. See the privacy policy.